![]() ![]() Project Costs means all allowable costs, as set forth in the applicable Federal cost principles, incurred by a recipient and the value of the contribu- tions made by third parties in accom- plishing the objectives of the award during the project period. ![]() Di- rect costs do not include overhead ex- penses such as the cost of space and heating or lighting the facility in which the records are stored. Direct costs include the salary of the employee per- forming the work (the basic rate of pay for the employee plus 16 percent of that rate to cover benefits) and the cost of operating duplicating equipment. the EPC Costs outlined in its NovemApplication) by up to 7.0% (the “Adjusted EPC Costs Baseline”).ĭirect Costs means those expendi- tures which the Commission actually incurs in searching for and duplicating (and, in the case of commercial use re- questors, reviewing) documents to re- spond to a FOIA request. Skipjack Offshore Energy, LLC may discount the baseline used for comparison in the implementation of this mechanism ( i.e. Pöyry compared the EPC Costs with other comparable projects and found that the proposed price by CHK is lower than the costs estimated by EGAT for the construction of 230/500 kV substation by Baht 121.70 million or by 5.26%.Īn EIA is typically 0.1% of the total project cost.Contingency and IDC was calculated as follows:ĭECISION ON INVESTMENT COSTSIn relation to the EPC Costs, the RAs are content that a rigorous assessment of these costs was carried out by the CEPA/PB and the proposed costs in the consultation paper are valid. INR 6,020.80 EPC Costs(BTG) INR 148,940.85 Non EPC Costs INR 21,500.86 Misc.ĮPC Costs $/ MTPA 1x3.3 MTPA1x5.7 MTPAIncludingmarine & storage2x3.6 MTPA trains1x7.2 MTPA2.0 4.0 6.0 8.0 10.0Nominal Capacity, MTPAFigure 4: Total Direct Cost Comparison for Large Trains - Courtesy of The ConocoPhillips and Bechtel LNG Collaboration Product Development Center This trend is confirmed by a comparison of the Egyptian LNG project with recent LNG projects that selected 5.0 MTPA trains.ĬGPL has estimated the same to be around 5% of the total EPC Costs. Realized savings equal to the positive amount, if any, resulting from the formula: “Adjusted EPC Costs Baseline” minus documented EPC Costs.Įstimated Non-Payroll Expenditures during Development and Construction of the Facility Cost (2021$)Equipment and Materials ( EPC Costs), excluding site preparation$ Site Preparation$ Generator Step-up (GSU) Substation$ Interconnecting (Gen-Tie) Lines$ Modules$ Total Non-Payroll Costs$ > END CONFIDENTIAL INFORMATION As detailed above, Applicant-provided non-payroll cost estimates are roughly BEGIN CONFIDENTIAL INFORMATION END CONFIDENTIAL INFORMATION. The report shall verify the documented EPC Costs associated with the Qualified Offshore Wind Project.
0 Comments
Leave a Reply. |